Cliffside

2330 Kingston Road · Cliffside, Scarborough

Rental homes
209
Storeys
10
Product
Purpose-Built Rental
Status
Under Construction
Partner
Cogir Real Estate
Construction updates ↗

209 purpose-built rental apartments with new retail space in the heart of Cliffside Village.

The gateway to southwest Scarborough and home to the famous Scarborough Bluffs, Cliffside represents a unique mix of natural beauty and modern urban living. Cliffside is LCH Developments’ third project in Cliffside Village, across the street from Merge Condos and Merge Spaces, and continues our commitment to shaping a walkable and vibrant urban village.

Together with our partners at Cogir Real Estate, this 10-storey development will bring 209 purpose-built rental apartments and new retail space to the neighbourhood. Now under construction, Cliffside connects the energy of Kingston Road with the nearby lake, parks and waterfront trails. The building is designed to complement the village character of the area, with a planned four-storey mural on its east façade.

LCH’s role and approach

Originally planned as a condominium, Cliffside was redesigned as a 209-home purpose-built rental building. LCH coordinated the change across unit mix, building systems and approvals with its partner, Cogir Real Estate, before construction began.

Progress

Construction status

  1. In Development
  2. Under Construction Construction milestones
    1. Demolition and site setup Feb 2026 – Aug 2026
    2. Geothermal drilling Apr 2026 – Jul 2026
    3. Shoring and excavation Jul 2026 – Oct 2026
    4. Tower crane erection Oct 2026
    5. Foundations and below-grade construction Nov 2026 – Apr 2027
    6. Above-grade formwork Apr 2027 – Jul 2027
    7. Roofing and exterior works Jul 2027 – Dec 2027
    8. Landscaping Nov 2027 – Feb 2028
    9. Occupancy inspections Jan 2028 – Mar 2028
    10. Target move-in Mar 2028

    Target dates from the construction schedule; they may change. Latest updates ↗

  3. Complete
Schedule, site photos and email updates
  1. Latest

    Foundations and below-grade construction under way

    Source: Cliffside construction updates ↗
  2. Tower crane installed; excavation for three-level garage advancing; now a 209-home rental building

    Source: UrbanToronto ↗
  3. Geothermal drilling under way

    Source: Cliffside construction updates ↗
  4. Shoring began (as reported by UrbanToronto, Nov 5, 2026)

    Source: UrbanToronto ↗
  5. Demolition (as reported by UrbanToronto, Nov 5, 2026)

    Source: UrbanToronto ↗
  6. Launch of Cliffside Condos reported

    Source: UrbanToronto ↗
  7. Revised Site Plan Approval application reported (then planned as condominiums)

    Source: UrbanToronto ↗